DTS Question
Is there a way that you can run two different Dts packages, with on dependent on the other? What I mean by that is, I have one package that I need to run, before the other. If for some reason the first package fails, I don't want the other to run. Please Help.
Thanks in advance
-
Put them in same job as two steps, quit the job if first step fails.